SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2005058076,"Water Resources, Department of",California Department of Water Resources,DWR,South Delta Improvement Program Exploration Drilling Project,NOE,5/3/2005,5/3/2005,"The purpose of the SDIP Exploration Drilling Project is to collect geologic data on channel and land sediments. These data are necessary for the design and construction of various features of the SDIP, specifically the radial gates at the four proposed permanent barrier sites at Old River, head of Old River, Middle River, and Grant Line Canal-West. Data would be collected from drill cuttings at these four locations, for a combined total of 6 in-channel holes, 3 deep landside holes, and 18 shallow landside holes. Deep holes would be drilled 100-130 feet deep; shallow holes, 10-30 feet deep. Each hole would be 4.5 inches wide. Sediment characteristics would be analyzed according to standard methods. All deep holes would be backfilled with a bentonite cement grout upon completion. Following soil classification, 6 of the shallow holes would be converted to permanent observation wells, while the remaining 10 would be backfilled. South Delta water diverters may benefit from completion of this project, as the collection of these data is necessary to designing the SDIP.",https://ceqanet.opr.ca.gov/2005058076,South Delta Improvement Program Exploration Drilling Project,Juan Escobar,Department of Water Resources,N/A,,901 P Street,,Sacramento,CA,94236,9166533283,,Tracy,"Contra Costa, San Joaquin",,,,,,,,,,,,,,,,,Categorical Exemption,Section 15306,"Project involves the collection of basic data and would not result in a serious or major disturbance to any aquatic or terrestrial resources. Water quality would not be impacted because no discharge of sediments into the water channel would occur. Further, in-channel work would occur during the window of time recommended to avoid impacts to sensitive aquatic species/habitats (August-November).",,,,,,,,,,,,