SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2005052088,"Mountain View, City of",City of Mountain View,,Shoreline Sailing Lake Water Supply Project (CIP 04-18),NEG,5/17/2005,,"The City of Mountain View (City) proposes to modify and upgrade the infrastructure that delivers water from Inner Charleston Slough (ICS) to supply the Shoreline Sailing Lake (Lake) at Shoreline at Mountain View Regional Park. Project goals include providing a long-term reliable supply of water for the Lake; ensuring that operations and maintenance costs are predictable and controllable; and sustaining or improving water quality in the Lake. The proposed project would replace the existing pump station with a new facility of the same capacity and extend a new Lake Pipeline along the north side of the Lake. The Lake Pipeline would also provide for a new flushing operation that would allow water to be discharged from the Lake into ICS periodically to remove accumulated sediment. The existing pipeline would be capped and abandoned in place. The existing outlet facilities at the east end of the Lake would be modified slightly and remain in service to allow continued discharge from the Lake into Permanente Creek.",https://ceqanet.opr.ca.gov/2005052088,Shoreline Sailing Lake Water Supply Project (CIP 04-18),Nirmal Saijan,City of Mountain View,N/A,,231 N. Whisman Road,,Mountain View,CA,94039-7540,6509036284,,Mountain View,Santa Clara,,Terminal Blvd. / San Antonio Road,94043,2.5,015-36-025,"85, US-101","Charleston Slough, Permanente Creek, Stevens Creek",,No,5/17/2005,6/15/2005,"Recreational, Water Facilities",,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildlife",,,,,,,,,,,,,,,,,