SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2005048361,"Parks and Recreation, Department of",California Department of Parks and Recreation,,North Grove Day Use Area New Combination Building,NOE,4/26/2005,4/26/2005,"1. Construct a new 150 Series Combination Building (CB) at North Grove Day Use Area in Calaveras Big Trees State Park. The new CB will be mostly located in an existing parking lot to minimize grading, site disturbance and impacts to the existing drainage. Four young trees (dbh 12-24 inches) will be removed. One mature sugar pine on the edge of the parking lot to the NE will be left in place; structural roots will be avoided and there will be no grading or excavating within the dripline (~12-15' from the trunk of the tree). 2. Provide 5 accessible day use picnic sites in the day use area with (non-asphalt) ADA compliant path-of-travel to the new CB. 3. Modify campsites 65, 67, and 73 to provide the following fully ADA accessible features: - Parking spurs, picnic tables, fire rings, and bear boxes. - ADA compliant (stabilized soil) campsite surface. - Modify paths of travel between ADA campsites and new combination building. 4. Utility work will be undertaken, including: - Connect new CB to existing water and sewer systems. - Extend electrical line from existing park facility, underground, to the new CB. - Install propane system. - Install minor exterior lighting at the new CB for visitor safety. 5. Create 4-6 accessible parking spaces at site of the new CB. 6. Retain existing historic-era flush toilets in North Grove Day Use Area.",https://ceqanet.opr.ca.gov/2005048361,North Grove Day Use Area New Combination Building,Susan E. Wilcox,California Department of Parks and Recreation,N/A,swilcox@parks.ca.gov,1416 Ninth Street,P.O. Box 942896,Sacramento,CA,94296-0001,9164458933,,,Calaveras,,,,,,,,,,,,,,,,,Categorical Exemption,"Section 15303, 15304","Project consists of construction of a new, small public structure and associated utility extensions, ADA improvements in a public use area, and minor alterations in the condition of land and vegetation which does not involve removal of healthy, mature, scenic trees, included on DPR's list of exempt activities as ""construction of restrooms,"" ""modifications of existing facilities for handicap access,"" and ""minor trenching and backfilling, where surface is restored,"" in accordance with CCR §15300.4.",,,,,,,,,,,,