SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2005031175,Central Basin Municipal Water District,,,Southeast Water Reliability Project (Montebello Loop),NOD,5/3/2005,5/3/2005,"The proposed project is a local recycled water distribution system that would offset the imported potable water supplies from the State Water Project. The Project would ultimately serve 28 potential public and private entity sites along the pipeline, including one anchor customer (Montebello Golf Course) at the terminal end of the pipeline, with over 800 acre feet per year of recycled water. The project would include the installation of approximately 4.5 miles of 30-inch recycled water pipeline that would be buried within roadway in the Cities of Pico Rivera and Montebello. The starting point of the pipeline would be in the City of Pico Rivera at the intersection of San Gabriel River Parkway and Beverly Boulevard, where the proposed pipeline would connect to the existing San Gabriel River Parkway Recycled Water Pipeline Lateral. From this starting point, the pipeline would be routed west along Beverly Boulevard throughout the City of Pico Rivera and enter the City of Montebello. At the intersection of Beverly Boulevard and Rea Drive in the City of Montebello, the pipeline would be routed north along Rea Drive to Lincoln Avenue. The pipeline would then be routed west along Lincoln Avenue and end at the Montebello Golf Course. The trench excavated for the installation of the new pipeline would average eight feet in depth and four feet in width. The trench would be refilled using native backfill with an asphalt cap.",https://ceqanet.opr.ca.gov/2005031175/2,Southeast Water Reliability Project (Montebello Loop),Uzi Daniel,Central Basin Municipal Water District,N/A,,"17140 S. Avalon Boulevard, Suite 210",,Carson,CA,90746-1296,3106606245,,"Montebello, Pico Rivera",Los Angeles,,Beverly Blvd. / Rosemead Blvd. / Lincoln Ave.,"90660, 40",,,"60, 19","San Gabriel River, Rio Hondo Channel",,,,,,,,,,,,,Board of Directors of the Central Basin Municipal Water District,Yes,4/29/2005,No,No,Yes,,No,,No,No,Central Basin Municipal Water District