SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2005031091,"Fullerton, City of",City of Fullerton,,Hillcrest Park Reservoir Reconstruction,NOD,5/20/2005,5/20/2005,"The City of Fullerton is proposing to replace the existing, deteriorated Hillcrest Reservoir and associated piping. The project includes removing the existing reservoir, which was a 5 million gallon capacity and an oval-shaped footprint, and constructing a new circular shaped reservoir having the same capacity. The proposed reservoir will be constructed at the same location as the existing tank, at a similar elevation. The new reservoir tank will buried beneath the surface of the ground, and the area above it will be made accessible for public use. The project also includes construction of an 18"" inlet-outlet pipeline and 18"" drain line from the reservoir, through the park, south to Valley View Drive. Piping will also be installed within the Valley View right of way from Harbor Blvd. to Lemon Street. This will result in temporary road closures during construction.",https://ceqanet.opr.ca.gov/2005031091/2,Hillcrest Park Reservoir Reconstruction,Lorrie Lausten,City of Fullerton,N/A,,303 W. Commonwealth Avenue,,Fullerton,CA,92832-1775,7147386895,,Fullerton,Orange,,Lemon Street / Valley View Drive,92831,,029-01-09,"SR 57, SR 91",,,,,,,,,,,,,,City of Fullerton ,Yes,5/17/2005,No,No,Yes,,Yes,,No,Yes,"303 W. Commonwealth Avenue Engineering Dept., Second Floor Fullerton, CA 92832"