SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2005011071,Castaic Lake Water Agency,,,Honby Pipeline Project,NOP,1/14/2005,,"The project is the construction and operation of a 60-inch, approximately 9,500-foot water pipeline. It would replace the existing Honby Pipeline , which is undersized (it does not meet current peak demand and will not meet projected future demand) and partially located in an area proposed for development. The existing pipeline connects to the 84-inch Treated Water pipeline from the Rio Vista Water Treatment Plant approximately 6,000 feet west of the westerly property line of the treatment plant. From the connection point, the existing pipeline extends east, roughly parallel to the Santa Clara River, then turns south and crosses the river. It then continues in an easterly direction and terminates at the new Sand Canyon pump station, which is currently under construction and is replacing the existing Honby pump station.",https://ceqanet.opr.ca.gov/2005011071,Honby Pipeline Project,Dan Masnada,Castaic Lake Water Agency,N/A,,27234 Bouquet Canyon Road,,Santa Clarita,CA,91350,6612971600,,Santa Clarita,Los Angeles,,Soledad Street and Furnivall Avenue,91350,1-2,,I-5,Santa Cara River,,Yes,1/14/2005,2/14/2005,Water Facilities,,"Air Quality, Cultural Resources, Noise, Population/Housing, Vegetation, Wetland/Riparian, Wildlife",,,,,,,,,,,,,,,,,