SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2004102005,"West Sacramento, City of",City of West Sacramento,,CEMEX Construction Materials Terminal Project,NOD,8/10/2006,8/10/2006,"The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2006-0211-R2 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Port of Sacramento. Dredging is required to relocate a cement terminal to a parcel adjacent to the Port of Sacramento as part of the City of West Sacramento's Redevelopment Plan. The project involves dredging the bank and bottom of the Sacramento River Deep Water Shipping Channel (a commerce waterway excavated from uplands) to allow room for ship docking and construction of dock. Dredged material will include sediments and soil from the Channel and will total approximately 97,000 cubic yards. The dredge tailings will be placed across the channel from the Study Area at the Port's ""S-1"" upland disposal site. Rip-rap will be placed along 800' of the dredged shoreline to control erosion from 0' to the top of the bank. Concrete and steel pilings totaling about 4,860 sq. ft. will be permanently placed along the Channel bank to support a dock and access bridge. The current shoreline in the project area is a rip-rap slope with no wetland or riparian vegetation. Previous site use of the project area was a wood chip manufacturing facility and much of the surrounding area harbors industrial facilities. Cement storage, mixing, and distribution facilities will be built in the upland portion of the site after the waterward work is complete.",https://ceqanet.opr.ca.gov/2004102005/5,RMC Pacific Materials Project Final EIR,Gary L. Hobgood,California Department of Fish and Game,N/A,,"1701 Nimbus Road, Suite A",,Sacramento,CA,95670,9169836920,,West Sacramento,Yolo,,Parkway / Seaport,,27 +/-,Various,,Port of Sacramento Deep Water Channel,None,,,,,,,,,,,,California Department of Fish and Game ,No,8/2/2006,,No,Yes,,Yes,,Yes,Yes,"City of West Sacramento 1110 W. Capitol Avenue West Sacramento, CA 95691"