SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2004101032,"San Diego, City of",City of San Diego,,Master Storm Water System Maintenance Program,EIR,7/13/2009,,"Master Site Development Permit and Coastal Development Permit for the long-term maintenance of storm water facilities maintained by the City of San Diego's Storm Water Department (SWD). The storm water facilities include a series of natural and/or constructed drainage channels along with associated drainage control structures (e.g. outfalls and detention basins) located throughout the metropolitan area. The MSWSMP identifies the maintenace activities anticipated to be carried out for each drainage facility. The Master Program also establishes a series of protocols to be carried out during maintenance activities that are intended to minimize impacts related to soil and erosion, water quality, and wildlife disruption. A Substantial Conformance Review procedure will also be established as part of the permit approval and environmental document certification.",https://ceqanet.opr.ca.gov/2004101032/3,Master Storm Water System Maintenance Program,Myra Herrmann,City of San Diego,N/A,,"1222 First Avenue, MS-501",,San Diego,CA,92101,6194465372,,San Diego,San Diego,,several,,,,"58, 163, 15, 805","San Diego River, SD Bay, Mission Bay, TJR","San Diego Int'l,Montgomery Field",No,7/13/2009,8/26/2009,Other,Coastal Permit,"Aesthetics, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Hydrology/Water Quality, Land Use/Planning, Solid Waste, Vegetation, Wetland/Riparian",,,,,,,,,,,,,,,,,