SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2004091057,Elsinore Valley Municipal Water District,,,Lake Elsinore Advanced Pumped Storage Project (LEAPS) and Talega-Escondido/Valley-Serrano 500 kV Interconnect Project (TE/VS Interconnect),NOP,5/31/2006,,"Pumped Storage Upper Reservoir: The proposed project would include a new upper reservoir located within the Cleveland National Forest in the mountains above Lake Elsinore. One proposed location for the upper reservoir would be in Morrell Canyon and the other in Decker Canyon. The reservoir would be approximately 100 acres in surface area and be able to hold roughly 5,500 acre-feet of water. Pumped Storage Powerhouse: Three potential powerhouse locations have been identified for the proposed project, referred to as the Ortega Oaks, Santa Rosa and Evergreen Sites. The powerhouse will be located underground in close proximity to Lake Elsinore and will contain two or more reversible pump-turbine units. The size of the site wil be less than 100 acres. Pumped Storage Water Conduits: The proposed project includes underground high-head and lowhead water conduits, which will connect the upper reservoir to the powerhouse and Lake Elsinore below, and channel water between the upper reservoir and Lake Elsinore during the project's operation. TE/VS Interconnect: This portion of the project would consist of an approximately30-mile overhead 500kV electrical transmission line interconnecting SDG&E's existing Talega-Escondido 230-kV transission line in western Riverside County.",https://ceqanet.opr.ca.gov/2004091057/3,Lake Elsinore Advanced Pumped Storage Project (LEAPS) and Talega-Escondido/Valley-Serrano 500 kV Interconnect Project (TE/VS Interconnect),Greg A. Morrison,Elsinore Valley Municipal Water District,N/A,,31315 Chaney Street,P.O. Box 3000,Lake Elsinore,CA,92531-3000,9096743146,,Lake Elsinore,Riverside,,,,,,"SR-14, I-15",Lake Elsinore,,Yes,5/31/2006,6/29/2006,Other,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Population/Housing, Public Services, Recreation, Transportation",,,,,,,,,,,,,,,,,