SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2004078203,Tamalpais Union High School District,,,Tamalpais Union High School District Facilities Modernization Program,NOE,7/14/2004,7/14/2004,Replace a cafeteria building that was destroyed by a fire in the 1980's. The new cafeteria is 9489 sf and is to be constructed with the general foot print of the previously destroyed cafeteria. The project also includes renovation of the existing student center into a kitchen. Several small trees near the buildings will be removed.,https://ceqanet.opr.ca.gov/2004078203,Tamalpais Union High School District Facilities Modernization Program,V-Anne Chernock,Tamalpais Union High School District,N/A,,305 Doherty Drive,,Larkspur,CA,94977,4159427624,,San Anselmo,Marin,,,,,,,,,,,,,,,,,Categorical Exemption,"sec 15302, 15303","Class 2- Replacement or Reconstruction: The new cafeteria building will replace the cafeteria building destroyed by fire. The new cafeteria will have substantially the same purpose and capacity as the original cafeteria. Class 3- Conversion of Small Structures: The existing student center will be renovated into a kitchen. Only minor modifications to the exterior will be made.",,,,,,,,,,,,