SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2004048370,Marin Resource Conservation District,,,John and Will Brazil Dairy Stormwater Management and Habitat Improvement Project,NOE,4/20/2004,4/20/2004,Installation of a heavy use area protection structure (barn extension and roof replacement) with roof runoff structure (gutters on barn) and an underground outlet to capture clean water runoff from the barn roof; installation of waste storage facilities (expansion of existing waste ponds).,https://ceqanet.opr.ca.gov/2004048370,John and Will Brazil Dairy Stormwater Management and Habitat Improvement Project,Nancy Scolari,Marin Resource Conservation District,N/A,,P.O. Box 1146,145 A Street,Pt. Reyes Station,CA,94956,4156631170,,Petaluma,Sonoma,,,,,,,,,,,,,,,,,Categorical Exemption,"Cls 2,3,30;Sec 15302,15303,15330","Class 2-replacement of the barn roof qualifies as reconstruction of an existing structure on the same site having substantially the same purpose and capacity. Class 3-installation of the barn extension, gutters, and underground outlet qualify as new construction of small, new equipment and facilities in small structures. Class 30-expansion of waste storage facilities qualifies as a minor action to prevent, minimize, stabilize, mitigate, or eliminated the release or threat of release of hazardous waste or substances.",,,,,,,,,,,,