SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2003101142,Orange County,,,Dana Point Harbor Marina Improvement Project,NOP,1/6/2010,,"NOTE: Re-issued NOP The Local Coastal Program Amendment (LCPA) for the proposed Dana Point Harbor Revitalization Project was approved with modification by the California Coastal Commission (Commission) on October 8, 2009. The waterside portion of the project is now proceeding through a separate, independent process for environmental clearance and approval. The Dana Point Harbor Marina Improvement Project renovations will include removal of nearly all floating docks and piles; reconstruction of portions of the degraded quay wall; installation of new docks, guide piles (or alternative anchoring methods), gangways, security gates, dock boxes, and utilities. Additionally, new dry stack storage staging docks and dinghy docks, along with renovations to the Youth and Group docks, guest docks, Harbor Patrol docks, commercial fishing docks, and sport fishing docks are included in the proposed Project. The project includes public access improvements to gangways and docks in compliance with the Americans with Disabilities Act (ADA) guidelines, and construction of temporary docks located along the breakwater adjacent to Doheny State Beach. At project completion the total number of boat slips would result in a net loss of no more than 155 slips. ",https://ceqanet.opr.ca.gov/2003101142/5,Dana Point Harbor Marina Improvement Project,Brad Gross,"Orange County, Dana Point Harbor Dept.",N/A,,24650 Dana Point Harbor Drive,,Dana Point,CA,92629,9499232236,,Dana Point,Orange,,Golden Lantern Street / Dana Point Harbor Drive,92629,169.7,Water Area,"Hwy 1, I-5",San Juan Creek,No,Yes,1/6/2010,2/4/2010,"Recreational, Water Facilities","Coastal Permit, Site Plan, Use Permit","Aesthetics, Air Quality, Biological Resources, Coastal Zone, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Recreation, Solid Waste, Transportation, Vegetation, Wildlife",,,,,,,,,,,,,,,,,