SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2003078294,Stockton East Water District,,,Conjunctive Use of San Joaquin Area Flood Control Agency (SJAFCA) Detention Basin No. 1 for Groundwater Recharge,NOE,7/18/2003,7/18/2003,"Detention Basin No. 1 was built by SJAFCO in 1996 to protect lands within the City of Stockton and County of San Joaquin from flooding events associated with Mosher Creek. During non-flood periods (mid-April through October of each year) Stockton East Water District will divert water through Mosher Slough into the Detention Basin and allow it to percolate to the groundwater. Recharge operations will cease at any time if there is athreat of floodig in and out around this area, or at the request of SJAFCA. The work will be completed under the umbrella of the Farmington Groundwater Recharge and Seasonal Habitat Study, and is being financed by federal, state and local funds. Required improvements would include the addition of a board to the existing Mosher Slough Dam owned by Woodbridge Irrigation District, grading the bottom of the Basin, and the possible installation of a temporary pump along Mosher Slough at the Detention Basin.",https://ceqanet.opr.ca.gov/2003078294,Conjunctive Use of San Joaquin Area Flood Control Agency (SJAFCA) Detention Basin No. 1 for Groundwater Recharge,Kevin M. Kauffman,Stockton East Water District,N/A,,6767 East Main Street,,Stockton,CA,95205,2099480333,,,San Joaquin,,,,,,,,,,,,,,,,,Categorical Exemption,"Sections 15301, -02, -03, -04","Project involves minor public alterations to existing sructure or facilities, reconstruction of existing facilities, conversion of facilities, and minor alterations to land and water that do not involve the removal of mature, scenic trees.",,,,,,,,,,,,