SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2003071115,Carpinteria Sanitary District,,,Carpinteria Sanitary District's South Coast Beach Communities Septic to Sewer Project Supplemental Environmental Impact Report,FIN,9/8/2006,,"The project consists of annexations of property into the CSD, establishment of assessment districts for project financing, and construction and operation of wastewater collection and transfer infrastructure. The proposed infrastructure component of the project would involve the construction and operation of five separate wastewater conveyance systems to serve each of the five beach communities. Each would require the construction of public and private sewer facilities. Public sewer facilities would be constructed and operated by CSD, and would provide each homeowner with the opportunity to have public sanitary sewer service. Private sewer facilities would be required to connect homes to public sewer system, from which wastewater would be conveyed to the Carpinteria Wastewater Treatment Plant (CWWTP). The public infrastructure would include gravity sewers, force mains, laterals to the property lines of the private lots, pump stations, manholes, and cleanout stations. The project, as described above, was the subject of a Final Environmental Impact Report (FEIR) certified by the CSD Board of Directors on September 7, 2004. However, since that time, the District has identified design revisions to the infrastructure proposed for the Rincon Point Community that are intended to reduce significant unavoidable environmental impacts identified in the FEIR. These revisions include but are not limited to the following alternative construction design measures: rerouting of the sewer line from the Rincon Point Community to the existing collection system, use of low pressure force mains, and relocation of pump station(s). It was also determined that an additional sewer line segment, not previously analyzed would be required in the Rincon Point Community.",https://ceqanet.opr.ca.gov/2003071115/4,Carpinteria Sanitary District's South Coast Beach Communities Septic to Sewer Project Supplemental Environmental Impact Report,Craig Murray,Carpinteria Sanitary District,N/A,,5300 Sixth Street,,Carpinteria,CA,93013,8056847214,,Carpinteria,"Santa Barbara, Ventura",,,,,Various,US-101,Pacific Ocean,,No,,,Other,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife",,,,,,,,,,,,,,,,,