SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2003062154,Humboldt County,,,Mercer Fraser Company,NOD,10/9/2003,10/9/2003,"A 15-year permit term renewal for a previously approved gravel mining and processing operation which has been permitted and operating since 1969. The project includes a Conditional Use Permit extension, Special Permit extension, Reclamation Plan review, and review of financial assurance cost estimates for a surface mining and processing operation involving the annual extraction of 40,000 cubic yards of sand and gravel from Trinity River gravel bars at the extraction site over a 15-year period. The method of surface rock removal involves skimming with loader, scraper, and excavator. Aggregate materials are temporarily stockpiled and loaded onto trucks or off-road haulers and then transported to the existing adjacent processing site or to off-site locations. Processing operations involve material crushing and/or hauling; on-site storage of materials; production of asphalt; and weighing and hauling by truck. Site improvements existing at the southern portion of the processing site include a hot mix asphalt plant, rock crusher, screen settling basin, gate, office, and scales. Under the previous permit, hours of operations were restricted daylight hours Monday through Saturday, generally 7:00 am to 6:00 pm.",https://ceqanet.opr.ca.gov/2003062154/2,Mercer Fraser Willow Creek Gravel Bar Mining Plan,Michael Wheeler,Humboldt County Planning Department,N/A,,3015 H Street,,Eureka,CA,95501-4484,7072683730,,,Humboldt,,HIghway 96 and Willow Creek,95573,138,522-142-10 et al.,HIghway 96,Trinity River,,,,,,,,,,,,,Humboldt County Planning Commission ,Yes,9/4/2003,No,No,Yes,,Yes,,No,Yes,