SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2003042127,"San Jose, City of",City of San Jose,,Bo Town Mixed Use Project,EIR,4/28/2022,,"Site Development Permit to redevelop the site with 30-story mixed use building with up to 540 residential units and approximately 5,491 square feet of ground floor retail space. The maximum height of the building would be approximately 293 feet to the rooftop. Parking for the residential units would be provided in a four-level, below-grade parking garage containing 175 parking stalls and 176 bicycle parking spaces. As proposed, construction would take place six days a week, Monday through Saturday, (7:00 am to 10:00 PM) for approximately 33 months.",https://ceqanet.opr.ca.gov/2003042127/32,Milligan Parking Lot Project,Kara Hawkins,City of San Jose,Planner II,kara.hawkins@sanjoseca.gov,200 E Santa Clara Street,T3,San Jose,CA,95113,4085357852,,San Jose,Santa Clara,,E. San Salvador Street and S. Second Street,95113,0.75,"467-47-097, -020, and -019","680, 280, 87",Guadalupe River,San Mineta International,No,4/29/2022,6/14/2022,"Commercial, Residential",Site Plan,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire",4/29/2022,6/14/2022,,,,,,,,,,,,,,,