SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2002122056,Butte County,,,Ord Ferry Bridge Seismic Retrofit Project,NOD,12/19/2011,12/19/2011,"The California Department of Fish and Game is executing Lake or Streambed Alteration Agreement number 1600-2011-0122-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, Butte County. The Project involves retrofitting of six of the eight bridge piers. This retrofitting will involve driving sheet piles into the Sacramento River approximately 3.5 feet from the existing pile cap and excavating approximately 15 feet of native material that is between the sheet pile and the existing pile cap. The area will then be de-watered and the water will be pumped to the shore for treatment. New 14 inch round steel pipe piles will be driven between the existing pile cap and the sheet pile. Each foundation retrofit will require 12 steel pipe piles, so a total of 72 permanent piles will be required for the Project. A concrete seal course will be placed over the steel pipe piles using the sheet pile as the form. The existing concrete pile cap will be enlarged to cover the new pile. The sheet pile will then be removed.",https://ceqanet.opr.ca.gov/2002122056/4,Ord Ferry Road Bridge Seismic Retrofit,Jeb Bjerke,"DFG, North Central Region",N/A,,"1701 Nimbus Road, Suite A",,Sacramento,CA,95670,9163582956,,,Butte,,Ord Ferry Road,,,,45,Sacramento River,,,,,,,,,,,,,DFG ,No,12/15/2011,No,No,Yes,,Yes,,No,No,"Butte County Department of Public Works 7 County Center Drive Oroville, CA"