SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2002112033,Sonoma Marin Area Rail Transit Commission,,,Windsor Extension Project (Lake or Streambed Alteration Agreement No. 1600-2019-0190-R3),NOD,6/19/2020,6/19/2020,"The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2019-0190-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Sonoma-Marin Area Rail Transit District. The project is limited to the construction of approximately 3.5 miles of passenger rail service from the existing train station immediately south of Airport Boulevard in Santa Rosa to 0.45 miles northwest of Windsor River Road in the Town of Windsor, along the Northwestern Pacific Railroad rail corridor. Construction activities associated with the project include rehabilitation of the existing track, improvements to grade crossings, replacement and repair of various bridges, replacement of drainage culverts, installation of new culverts, construction of one new station platform and existing facilities, installation of a new signal system, installation of safety structures within a portion of the right-of-way, and construction of approximately 2 miles of non-motorized pathways. The three project components impacting streams are trackwork, bridge replacement, and culvert replacement and installation. Approximately 29 riparian trees, 6 inches in diameter at breast height and larger, will be removed as part of the project. They include the following species: valley oak (Quercus lobata), sandbar willow (Salix exigua), red willow (Salix laevigata), and arroyo willow (Salix lasiolepis) (Exhibit D). In total, the project will permanently impact approximately 21,868 square feet along 1,784 feet of streams.",https://ceqanet.opr.ca.gov/2002112033/37,Sonoma-Marin Area Rail Transit Todd Road Operations and Maintenance Facility,Garrett Allen,Department of Fish and Wildlife Bay Delta Region,N/A,,"2825 Cordelia Road, Suite 100",,Fairfield,CA,95434,7074282076,,,Sonoma,,,,,,,,,,,,,,,,,,,,CDFW,No,5/27/2020,No,Yes,No,,Yes,Yes,No,No,Available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as Responsible Agency is available at CDFW’s regional office.