SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2002108201,Metropolitan Water District of Southern California,,,Replacement of Valves at Service Connection EM-4,NOE,10/11/2002,10/11/2002,The Metropolitan Water District of Southern California (Metropolitan) is proposing the shutdown of the CRA at Station 11593+04 and discharging of approximately one-half acre-foot of water into the Perris Valley storm Drain. The shutdown will be performed in order to lower the water level to below the flanges located at service connection EM-4 to replace two existing valves.,https://ceqanet.opr.ca.gov/2002108201,Replacement of Valves at Service Connection EM-4,John Vrsalovich,Metropolitan Water District of Southern California,N/A,,P.O. Box 54153,,Los Angeles,CA,90054-0153,2132176066,,Perris,Riverside,,,,,,,,,,,,,,,,,Categorical Exemption,15302,The proposed project consists of the replacement of existing structures or facilities where the new structure will be located on the same site as the structure replaced and will have the same purpose and capacity as the structure replaced.,,,,,,,,,,,,