SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2002101141,"Long Beach, Port of",Port of Long Beach,,Port of Long Beach Gerald Desmond Bridge Replacement Project - HDP #04-086,NOD,12/22/2011,12/22/2011,"The EIR Addendum addresses revisions to the Gerald Desmond Bridge Replacement Project, which was originally approved by the Long Beach Board of Harbor Commissioners on August 9, 2010. The approved by the Long beach Board of harbor Commissioners on August 9, 2010. The approved project consists of a new bridge to be located approximately 140 feet north of the existing Gerald Desmond Bridge, related roadway connections, interchange and ramp improvements, and the demolition of the existing Bridge. The project changes that are the subject of the Addendum are as follows: (1) the addition of a Class 1 bikeway, including a pedestrian walkway, that connects SR 47 to Pico Avenue; and (2) the modification of the noise control measures to provide equivalent noise control/minimization in connection with a change in the allowable working hours during construction of the project.",https://ceqanet.opr.ca.gov/2002101141/9,Gerald Desmond Bridge Replacement Project,Stacey Crouch,Port of Long Beach,N/A,,925 Harbor Plaza,,Long Beach,CA,90802,5622837100,33°45.6'"N 118°11.9'"W,Long Beach,Los Angeles,,Ocean Boulevard and Pico Avenue,90802,,,I-710,Los Angeles River,,,,,,,,,,,,,City of Long beach ,Yes,12/19/2011,Yes,Yes,No,,Yes,,Yes,Yes,"The Port of Long Beach 925 Harbor Plaza Long Beach, CA 90802"