SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2002098171,Fish & Game #5,,,Streambed Alteration Agreement (R5-2002-0045),NOE,9/10/2002,9/10/2002,"Alter the streambed by replacing three existing, undersized culverts with new culverts to convey storm water and agricultural runoff from adjacent hills and farms under Highway 135 to San Antonio Creek. In addition to new culverts at all 3 sites (Post Miles 3.7, 4.7, and 5.9), the existing sack concrete and rock inlet and outlet will be replaced with a concrete headwall at PM 4.7, and cut-off walls will be constructed at the outlet and inlet at PM 5.9.",https://ceqanet.opr.ca.gov/2002098171,Streambed Alteration Agreement (R5-2002-0045),Trudy Ingram,"Department of Fish and Game, Region 5",N/A,,4949 Viewridge Avenue,,San Diego,CA,92123,8056409897,,Los Alamitos,Santa Barbara,,,,,,,,,,,,,,,,,Categorical Exemption,"Class 2, Section 15302",Replacement of existing structure which will have substantially the same purpose and capacity as the structure replaced.,,,,,,,,,,,,