SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2002098038,"San Diego, City of",City of San Diego,,Lake Murray Trunk Sewer Emergency Cleanin and Repairs,NOE,9/6/2002,9/6/2002,"Emergency cleaning by City forces of a 43-year old sewer line for a distance of approximately 20,430 feet. Severe grease buildup, heavy root infiltration, cracks, sagging pipe sections, and rocks have been noted via recent televising of this line. Sewer overflows have been reported along this line on 2/15/2000, 9/21/2000, 3/5/2001, 5/21/2001, and 8/21/2001. The pipe size varies from 8 to 18 inches in diameter and is made of vitrified clay and PVC. Construction will be needed in this canyon to approximately 104 manholes. Access to additional manholes may be required during emergency cleaning. These construction activities include grading, repair of maintenance access, and installation of water crossings, if needed. Once this is completed, other side canyon areas may need to be accessed and sewer lines cleaned depending upon the results of further inspections. All work will be coordinated with the community and be monitored by a biologist.",https://ceqanet.opr.ca.gov/2002098038,Lake Murray Trunk Sewer Emergency Cleanin and Repairs,Cathy Cibit,City of San Diego,N/A,,"1222 First Avenue, MS-501",,San Diego,CA,92101,6194465343,,San Diego,San Diego,,,,,,,,,,,,,,,,,Emergency Project,Section 15269 b & c,"This 43-year old sewer pipeline shows evidence of severe grease, cracks, heavy root intrusion, and debris and rocks in the line. Several seweroverflows have been noted in 2000 and 2001. The average daily flow is approximatel 0.52 million gallons per day (mgd) and the peak flow, 0.92 mgd. In the event of a sewer overflow, a significant amount of sewage can reach Lake Murray, Alvarado Creek, the San Diego River, the pacific Ocean, threatening wildlife habitat and public health and safety. Emergency cleaning is needed to prevent imminent spills and to avert further spills.",,,,,,,,,,,,