SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2002082043,"Eureka, City of",City of Eureka,,Phase 2b Force Main between Carrington and Wastewater Treatment Plant (West Force Main Section),NOD,2/26/2014,2/26/2014,"As Phase 2b of the Martin Slough Interceptor Project, the City of Eureka is proposing to construct force main piping from the new Martin Slough pump station in the Eureka Municipal Golf Course to the City of Eureka Elk River Wastewater Treatment Plant. The City is currently constructing the portion of this force main piping between the new pump station and the Carrington property (APN 302-171-035). The City is proposing to construct the remaining 4,350 LF of force main piping by open-trench and horizontal directional drilling (HDD) construction methods, portions of which are located within the NR and AC zoning districts where the pipeline is a conditionally permitted use. In addition to pipeline installation, this CUP includes pipeline laydown and staging areas, and temporary access improvements.",https://ceqanet.opr.ca.gov/2002082043/11,Martin Slough Interceptor Project,Lisa D. Shikany,City of Eureka,N/A,lshikany@ci.eureka.ca.gov,531 K Street,,Eureka,CA,95501-1165,7074414265,,Eureka,Humboldt,,Numerous City and County Streets,95501,,,101,Humboldt Bay; Martin Slough,,,,,,,,,,,,,City of Eureka ,Yes,2/25/2014,Yes,Yes,No,,Yes,,Yes,Yes,"City of Eureka, Community Development Department 3rd Floor, 531 K Street, Eureka CA 95501"