SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2002042159,"Parks and Recreation, Department of",California Department of Parks and Recreation,,Humboldt Redwoods State Park Bull Creek Watershed Rehabilitation Project,NEG,4/30/2002,,"Full road recontouring of 35 miles of abandoned, unstable inner-gorge service and skid roads within the Bull Creek Watershed. The work includes excavation of embankment fill from roads and stabilization of excavated materials on cutbench to fully recontour to natural topography. Removal of fill material from 150 seasonally dry stream crossings associated with the roads. The majority of the crossings have no flow during the construction phase and are typically small headwater swales. Stream crossing removal includes excavation of road and landing fill from road/stream channel crossings and stabilization of excavated materials. Stream channel beds, banks, and adjacent slopes would be restored to their pre-crossing configuration. Longitudinal stream gradient would be reestablished throughout the crossing site.",https://ceqanet.opr.ca.gov/2002042159,Humboldt Redwoods State Park Bull Creek Watershed Rehabilitation Project,Shaelyn Raab Strattan,Department of Parks and Recreation,N/A,,"One Capitol Mall, Suite 500",,Sacramento,CA,95814,9164458791,,,Humboldt,,State Highway 101,,,,101,Bull Creek Watershed,,No,4/30/2002,5/29/2002,"Recreational, Transportation",,"Air Quality, Drainage/Absorption, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Public Services, Recreation, Vegetation, Wetland/Riparian, Wildfire, Wildlife",,,,,,,,,,,,,,,,,