SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2002012017,Alpine County,,,Morrison Subdivision - Tentative Tract Map,NEG,1/7/2002,,"The project is a residential subdivision of 22 single family lots on 71.76 acres. The site is located on the north side of Hot Springs Road, approximately one mile west of Markleeville. The project is proposed in two phases. The first phase will consist of thirteen lots on the western portion of the site. Nine additional lots on the eastern portion of the site are planned for the second phase. A new access road connecting to Hot Springs Road will be constructed. An emergency only access road will extend through the adjoining property east of the site to provide a looped connection back to Hot Springs Road. A water system for fire protection only, not domestic use, is proposed to serve the entire subdivision. The system will include storage and fire hydrants along the new road within the subdivision. Domestic water supply and wastewater treatment will be provided by individual on site wells and septic systems.",https://ceqanet.opr.ca.gov/2002012017,Morrison Subdivision - Tentative Tract Map,Brian Peters,Alpine County Planning Department,N/A,,17300 State Highway 89,,Markleeville,CA,96120,5306941878,,,Alpine,,,,71.76,"02-250-018,02-250-019",,,,Yes,1/7/2002,2/8/2002,Residential,"Land Division (Subdivision, etc.)","Aesthetics, Cultural Resources, Drainage/Absorption, Geology/Soils, Hydrology/Water Quality, Land Use/Planning, Septic System, Vegetation, Wildfire, Wildlife",,,,,,,,,,,,,,,,,