SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2001128362,Metropolitan Water District of Southern California,,,Final Design and Replacement of Mixing and Settling Basin Equipment and Two Chemical Storage Tanks and the Diemer Filtration Plant,NOE,12/20/2001,12/20/2001,The Metropolitan Water District of Southern California proposes the final design and replacement of mixing and settling basin equipment and two chemical storage tank at the Diemer Filtration Plant. The equipment will be located at the same sites with same purposes and capacity as those older components being replaced.,https://ceqanet.opr.ca.gov/2001128362,Final Design and Replacement of Mixing and Settling Basin Equipment and Two Chemical Storage Tanks and the Diemer Filtration Plant,Laura Simonek,Metropolitan Water District of Southern California,N/A,,P.O. Box 54153,,Los Angeles,CA,90054-0153,2132176242,,Yorba Linda,Orange,,,,,,,,,,,,,,,,,Categorical Exemption,15302,The proposed project consists of the replacement and reconstruction of existing structures and facilities where the new structures will be locayed on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced.,,,,,,,,,,,,