SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2001122072,Amador Water Agency,,AWA,Buckhorn Water Treatment Plant and Pump Stations Replacement Project,NOD,1/28/2002,1/28/2002,"Replacement of the Buckhorn Water Treartment Plant and upgrade and modify the existing Tiger Creek and Silver Lake Pines Pump Stations including building a new 3 MGD (expandable to 5MGD) Water Treatment Plant and Pump Station upgrades for the CAWP system to meet current and future regulations and improving water supply reliability. The proposed plant includes the construction of two above ground 250,000-gallon water storage tanks, an 80,000 gallon equalization basin, a surge control/break tank and an 8,900 sq. ft. new treatment and maintenance building, necessary piping and facilities to support membrane treatment, pumping facilities, and telemetry upgrades to monitor and control remote tank and pressure reducing sites. Replacement of approximately 1300 feet of an existing backwash line and modification and replacement of the telemetry system at each of the 22 existing tanks, 3 pressure reducing stations and 1 other pump station. The project also includes applying to the State Water Resources Control Board for additional Water Rights.",https://ceqanet.opr.ca.gov/2001122072/2,Buckhorn Water Treatment Plant and Pump Stations Replacement Project,Gen Mancebo,Amador Water Agency,N/A,,12800 Ridge Road,,Sutter Creek,CA,95685,2092233018,,,Amador,,"Hwy. 88, Tiger Creek Rd., Forest Oak Rd.",95666,2.16+,"33-160-008, 33-010-024",88,Mokelume River,,,,,,,,,,,,,Amador Water Agency ,Yes,1/24/2002,No,No,Yes,,Yes,,,Yes,"Amador Water Agency 12800 Ridge Road Sutter, Creek, CA 95685"