SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2001062106,Humboldt County,,,"Jackson Jr., William",NOD,1/23/2002,1/23/2002,"A Conditional Use Permit, Surface Mining Permit, Reclamation Plan and review of financial assurance cost estimates for a surface mining operation involving an upland rock quarry with a proposed total extraction of 225,000 cubic yards of aggregate material over an expected life of 15 years. An average of 15,000 cubic yards of material will be extracted per year. The quarry site is approximately 3.6 acres in size. Heavy material to be used on site includes: a bulldozer for excavation; a rock crusher or rock screen for processing; and a rubber-tired loader for sorting, moving and loading the rock aggregate materials. Quarry operations will consist of excavation, ripping, sorting, loading, and hauling. The average number of trucks per day during operations is expected to be 21 with a maximum of 60. No structures or buildings, other than sanitary facilities will be used for the operation. Operations are expected to be conducted an average of 60 days per year.",https://ceqanet.opr.ca.gov/2001062106/2,"William F. Jackson, Jr.; Jacksonhill Ranch Quarry",Michael Wheeler,Humboldt County Planning Department,N/A,,3015 H Street,,Eureka,CA,95501,7072683730,,Blue Lake,Humboldt,,Wildcat Road and Camelot Lane,95525,3.6,101-051-07,299,Mad River,,,,,,,,,,,,,Humboldt County Planning Department ,Yes,8/16/2001,No,No,Yes,,Yes,,No,Yes,