SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2001062089,Turlock Irrigation District,,,Westside Acquisition Project,NEG,6/20/2001,,"The Turlock Irrigation District (TID), a public entity, plans to purchase electric facilities within 225 square miles of western Stanislaus County from Pacific Gas & Electric Corporation (PG&E), a regulated utility. The negotiated purchase includes approximately 200 linear miles of distribution facilities, all the equipment at the Patterson Substation, the distribution equipment within the Salado Substation, 0.25 miles of 60 kV transmission line into the Patterson Substation, and eventually, a 1.1-mile 60 kV transmission tap line to Patterson Frozen Foods. The transfer agreement also includes the lease of the land at the Patterson Substation and a portion of the Salado Substation property. The proposed project also includes the physical changes needed for TID to operate the acquired facilities independent of the PG&E system and serve the customers within the zone, including installing severance facilities at eight points in the distribution system along the boundaries of the new TID Westside service zone. TID also plans to acquire from PG&E the right to serve the electricity in the South Short Zone, an area near Don Pedro Reservoir that presently contains limited distribution facilities and would not require any severance construction.",https://ceqanet.opr.ca.gov/2001062089,Westside Acquisition Project,Kirk Tabar,Turlock Irrigation District,N/A,,333 East Canal Drive,P.O. Box 949,Turlock,CA,95381-0949,2098838349,,Patterson,"Mariposa, Stanislaus, Tuolumne",,,,<2,,"33, I-5","Orestimba and Del Puerto creeks, Aqueduct, canals","Patterson, NASA Crows Landing",No,6/20/2001,7/19/2001,Power,,"Aesthetics, Air Quality, Cultural Resources, Cumulative Effects, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Public Services, Vegetation, Wildfire, Wildlife",,,,,,,,,,,,,,,,,