SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2001058318,"Palo Alto, City of",City of Palo Alto,,5 MW Diesel Back-Up Generator Project,NOE,5/10/2001,5/10/2001,"The City of Palo Alto proposes to install four temporary, portable, diesel 1.35-MW generators at the Muncipal Service Center at 3201 E. Bayshore Road. The back-up generators would be used during Stage 3 electric shortages when the California Indepedent System Operator(ISO) has required Palo Alto to curtail load on the electric system. The City of Palo Alto would use the back-up generators to reduce rolling blackouts. The proposed project will also involve the relocation of four existing transformers and the construction of a 12 kV overhead distribution tap line to East Bayshore Rd.",https://ceqanet.opr.ca.gov/2001058318,5 MW Diesel Back-Up Generator Project,Rachel Adcox,City of Palo Alto,N/A,,250 Hamilton Ave,,Palo Alto,CA,94301,6503292189,,Palo Alto,Santa Clara,,,,,,,,,,,,,,,,,Declared Emergency,"21080,15269","The temporary, portable, diesel generators are consistent with the intent of Executive Order D-26-01, declaring the review of peaking or renewable power plants that can be on-line by July, 2001 to be exempt from CEQA. The order cites the energy supply emergency that ""poses a threat to public health, safety, and welfare, and requires the siting of new power plants that can be on-line to avoid electricity supply shortages this summer and next.",,,,,,,,,,,,