SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2001058106,Hueneme School District,,,Pipeline Crossing and Bank Stabilization Project,NOE,5/4/2001,5/4/2001,"This project consists of the construction of a pipeline crossing over the headwater of Norton Creek and stabilization of two short reaches of stream with rock rip-rap. The project site is just south of Lytton Springs Road, approximately 1/2 mile east of Healdsburg Airport. The pipeline will be suspended over the creek above the level of top-of-bank. Supports for the pipeline will be constructed outside the creek channel. The two bank stabilization sites are each 35 to 40 feet long and cover an area of about 300 square feet each. A total of about 25 cubic yards of gravel bedding and 55 cubic yards of rock rip-rap will facilitate revegetation. Willow cuttings will be placed in the rip-rap, buckeye trees and native grasses will be planted at the top-of-bank, and the site will be irrigated as needed in the first year to ensure vegetation establishment. Fish and Game issued Streambed Alteration Agreement Number R3-2001-0197 pursuant to Fish and Game Code Section 1603.",https://ceqanet.opr.ca.gov/2001058106,Pipeline Crossing and Bank Stabilization Project,Scott Wilson,"Department of Fish and Game, Region 3",N/A,,P.O. Box 47,,Yountville,CA,94599,7079445584,,Healdsburg,Sonoma,,,,,,,,,,,,,,,,,Categorical Exemption,Class 4; Section 15304,This project consists of minor alteration to land.,,,,,,,,,,,,