SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2000112054,"Water Resources, Department of",California Department of Water Resources,DWR,South Delta Temporary Barriers Project,NOD,5/31/2011,5/31/2011,"The proposed project involves annual installation and removal of three flow-control temporary rock barriers installed at Middle River near Victoria Canal (MR), Old River near Tracy (ORT), and grant Line Canal near Tracy Boulevard Bridge (GLC). It also includes the bi-annual installation and removal of one temporary rock barrier serving a dual purpose of fish control and flow control in the Spring and Fall at the head of Old river (HOR)near the San Joaquin River. As an alternative to installing the HOR barrier in the spring, DWR may opt to install a non-physical barrier at the head of Old River, as was done in 2009 and 2010. In addition, the MR weir height shall be raised by one foot, and in 2011, the project would include replacement of the GLC culverts and culvert frames, and incidental sediment removal adjacent to the culvert structures at the GLC barrier. Also, a 3-month fish monitoring program (2011 Fish Monitoring Program) shall be implemented from March 15 through June 15, concurrent with operations of the NPB (when installed). The study includes tagging and releasing salmon and steelhead throughout the south Delta, installing an acoustic receiver network, implementing a mobile monitoring effort to find acoustic tags on the river bottom using global positioning system (GPS), and sampling , tagging, and releasing up to 100 predatory fish 9obtained though electrofishing and/or hook and line sampling). DWR will also design and implement the Head of Old River (HOR) Predator Study with the intent of improving salmon smolt survival past the HOR during spring outmigration. This study would be implemented in conjunction with operation of the NPB.",https://ceqanet.opr.ca.gov/2000112054/8,"Temporary Barriers Project, 2001-2007",Andrea Boertien,DFG,N/A,,Bay Delta Region,7329 Silverado Trail,Napa,CA,94558,2099427060,,"Lathrop, Tracy",San Joaquin,,Finck Road/Klein Road/San Joaquin Road/Tracy Boulevard,,,,4/5,Old River/Middle River/Grant Line Canal,,,,,,,,,,,,,DFG ,No,5/25/2011,No,No,Yes,,Yes,,No,No,