SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2000098113,Caltrans 3 (Marysville),"California Department of Transportation, District 3",,Exploratory drilling on the southeast quadrant of the existing Noyo River Bridge,NOE,9/12/2000,9/12/2000,Caltrans is proposing to do exploratory drilling along the existing road on the southeast side of the Noyo River Bridge. The purpose of the drilling operation is to gather geological information of the area along the existing road.,https://ceqanet.opr.ca.gov/2000098113,Exploratory drilling on the southeast quadrant of the existing Noyo River Bridge,Lupe V. Jimenez,"Department of Transportation, District 3",N/A,,P.O. Box 942874 MS-41,,Sacramento,CA,94274-0001,9162745812,,Fort Bragg,Mendocino,,,,,,,,,,,,,,,,,Categorical Exemption,Class 4,Project proposes to do exploratory drillings. Drilling area along existing access road will be restored to existing condition. The diameter of the drill will be 6 to 8 inches in diameter. The drilling operation is not expected to have a significant impact on the environment.,,,,,,,,,,,,