SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2000091079,Livermore Valley Joint Unified School District,,,Texaco Hollister Ranch Pipeline Abandonment Project,NOP,9/20/2000,,"The project is the abandonment of pipelines in a corridor approximately seven miles long. The corridor starts at the Gaviota State Park and runs west through the Hollister Ranch to Augustin Point. The pipelines run parallel to shore and are approximately one-quarter mile from the shoreline. The pipeline crosses 11 creeks and a number of ravines. There are a total of three pipelines in the corridor, which include one 8 inch, one 6 inch and one 2.5-inch pipeline. The 2.5-inch pipeline runs approximately two miles to a pig receiver at Alegria Creek. The 8 inch and 6 inch pipelines run the entire seven miles. The pipelines are buried greater than three feet in depth along the entire corridor, except for those locations where they are exposed due to erosion or by design (pipelines spanning ravines on pipe supports). The pipelines are buried at various depths below the creek beds. There are a total of 38 locations along the pipeline corridor where work to abandon pipelines would be conducted. A number of different work procedures would be conducted at each site. ",https://ceqanet.opr.ca.gov/2000091079,Texaco Hollister Ranch Pipeline Abandonment Project,George Johnson,County of Santa Barbara Planning and Development,N/A,,1226 Anacapa Street,2nd Floor,Santa Barbara,CA,93101,8056849564,,,Santa Barbara,,Private road west of Gaviota State Park campground.,,"2,400","081-27-02; 083-65-11; 083-70-19, 18, 17, 16, 15, 03, 02, 01; 083-69-21, 20, 08, 07, 06, 01; 083-",101,"Caliete, Alegria, Cuarta, Sacate, Coyote, Santa Anita, Agua, Panochas, Bulito, Agujas, San",,Yes,9/20/2000,10/19/2000,,,,,,,,,,,,,,,,,,,,