SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2000042074,State Water Resources Control Board,,,Notification # 1600-2011-0144-R2 Farad Diversion Dam Replacement Project,NOD,2/5/2014,2/5/2014,"The California Department of Fish and Wildlife is executing Lake or Streambed Alteration Agreement number 1600-2011-0144-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, NV Energy. The project is limited to reconstruction of the Farad Diversion Dam and restoration of power generation from the 2.6 megawatt Farad Power Plant. The original Farad Diversion Dam was destroyed in a flood in January 1997. The proposed project includes the following components: 1) temporary water diversion, including mechanically stabilized earth wall; 2) temporary river crossing (bridge); 3) access road (river left) and portage trail (river right); 4) diversion structure, including roughened channels for fish passage and a boat/debris chute; 5) intake box structure and diversion conduit; 6) sediment detention channel with fish screen; 7) fish return and outfall; 8)flume reconstruction; 9) Old Highway 49 drainage improvements and 10) native plant vegetation. Bank and bed stabilization including mechanically stabilized earth walls, pre-formed grouted concrete, boulder boxes, and other stabilized materials will be installed to ensure the new facility can withstand a 100-year flood. Total construction area is about 7 acres. ",https://ceqanet.opr.ca.gov/2000042074/6,Farad Diversion Dam Replacement Project,Julie Newman,Department of Fish and Game,N/A,,"1701 Nimbus Road, Suite A",,Sacramento,CA,95670,5302836866,,,Nevada,,Highway 80 and the Floristan exit,,,,80,Truckee River,,,,,,,,,,,,,California Department of Fish and Game ,No,1/30/2014,,Yes,No,,Yes,,,Yes,"California Department of Fish and Wildlife North Central Region 1701 Nimbus Road, Suite A, Rancho Cordova CA 95670"