SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 1998022026,"Lodi, City of",City of Lodi,,CITY OF LODI WHITE SLOUGH POLLUTION CONTROL FACILITY EXPAN.,NOD,7/7/2003,7/7/2003,"Proposed interim aeration filtration, and UV disinfection improvements would be constructed within the main site described as: 1) Installing new multi-stage centrifugal blowers in the existing blower room; 2) Improving the blower building power supply to accommodate the new blowers; 3) Replacing of the aeration diffusers in two existing aeration basins; 4) Relocating the pumping station that supplies water to the NCPA power plant; 5) Removing and either disposing of or relocating sludge from an existing pond (i.e., the Aerated Pond) that would be used to equalize irrigation flowers; 6) Installing a pumping station to lift secondary clarifier effluent to the filters; 7) Installing granular or cloth-media tertiary filters; 8) Installing a coagulant feed equipment and building; 9) Installing clearwell and backwash pumping facilities; 10) Filling a portion of an existing pond (i.e., the Equalization Pond) to create a site for improvements (i.e., pumping station, tertiary filters, coagulant feed equipment and building, clearwell and backwash pumping facilities, and ultraviolet disinfection facilities); and 11) Installing ultraviolet disinfection facilities over the infilled pond area.",https://ceqanet.opr.ca.gov/1998022026/2,"City of Lodi White Slough Water Pollution Control Facility (WPCP) Aeration, Filtration, and UV Disinfection Improvements",J.D. Hightower,City of Lodi,N/A,,211 West Pine Street,,Lodi,CA,95240,2093336711,,Lodi,San Joaquin,,I-5/Eight Mile Road,,,055-120-05,I-5,Delta,,,,,,,,,,,,,"City of Lodi, Community Development Department ",Yes,6/25/2003,No,No,Yes,,Yes,,No,Yes,"Lodi City Hall Community Development Dept. 211 West Pine Street Lodi, CA 95240"