SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 1995052078,Sacramento County,,,Triangle Rock Products Zoning Agreement and Use Permit Amendments,NOP,6/25/2001,,"Zoning Agreement and Use Permit Amendments, as required by condition 45 of the Zoning Agreement Number 5269, to reflect the conditions of the secured Corps of Engineers permit. The proposed changes are as follows: (1) The elimination of mining in Laguna Creek. The Laguna Creek Corridor will now be preserved (Plate B, Current Reclamation Plan). The new proposal eliminates the mining of 23 acres in the original Phase III of the project. (2) Phase III is now proposed to be mined simultaneously with the new Phase X. (3) The mining phases have been renumbered to reflect the elimination of most of the original Phase III and the phases have been renumbered to reflect 10 phases (Plate C, Current Mining Plan). (4) The Laguna Creek Floodplain will now be preserved and contained by flood control berms. (5) Drainage from the north of Jackson Highway will now bypass the mined phases. (6) Phase I and Phase II will now be filled to approximate original grade (Plate B, Current Reclamation Plan). (7) The original Phase IX excluded mining of a five-acre parcel on Eagles Nest Road.",https://ceqanet.opr.ca.gov/1995052078/5,Triangle Rock Products Zoning Agreement and Use Permit Amendments,Dennis Yeast,Sacramento County,N/A,,"827 7th Street, Room 220",,Sacramento,CA,95814,9168747914,,Sacramento,Sacramento,,Jackson Road and Eagles Nest Road,,268,067-0120-062 and 069,16,"Laguna Creek, Cosumnes River",,Yes,6/25/2001,7/24/2001,Mining,,"Air Quality, Drainage/Absorption, Geology/Soils, Hydrology/Water Quality, Land Use/Planning, Wetland/Riparian, Wildlife",,,,,,,,,,,,,,,,,