SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 1992083049,Humboldt County,,,"Incidental Take Permit No. 2081-2018-043-01, Eureka Ready Mix Commercial Gravel Operation",NOD,8/20/2018,8/20/2018,"The project inludes vehicle and heavy equipment use within the riparian corridor and bank full channel of the Mad, Eel and Van Duzen rivers, excavation of aggregate from exposed bar surfaces, excavation of aggregate from deposits adjacent to the low-flow summer stream channel, isolated water bodies, and secondary channels. Access to extraction site amy require the placement and removal of temporary crossings. Excavation may also occur on high floodplain areas and in areas adjacent to riparian vegetation. The annual work period occurs between June 15 and October 31. Pre-extraction monitoring and planning activities begin as early as April 1 and may extend through July. Post-extraction monitoring and habitat surveys may extend through the month of November. Pre-extraction planning activities may involve travel to survey areas by passenger vehicle on existing haul roads and across exposed gravel bars of the Mad, Eel, Van Duzen river channels. Equipment used for excavation activities include rubber-tired loaders, tracked bulldozers, belly-scrapers, tracked excavators, large off-road haul trucks, belly dumps, dump trucks, personal vehicles, and quad runners.",https://ceqanet.opr.ca.gov/1992083049/53,Gravel Extraction on the Lower Mad River,Michael Wheeler,Humboldt County Planning and Building Department,N/A,,3015 H Street,,Eureka,CA,95501,7072683730,,"Arcata, Fortuna",Humboldt,,Hwy 101 and Hwy 299,95521,,multiple,"Hwy 101, 299","Mad River, Eel River, Trinity River, Van Duzen River",Arcata/Eureka,,,,,,,,,,,,CDFW ,No,8/8/2018,,Yes,No,,Yes,,No,No,