SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 1990011065,"Los Angeles, City of",City of Los Angeles,,Los Angeles Memorial Coliseum Renovation,NOD,8/3/2016,8/3/2016,"The lease agreement, as amended in 2013, provides for renovations to the Coliseum and management of the Coliseum by USC. USC proposes to renovate the Coliseum as previously contemplated in the Original Renovation Project EIR with some modifications. The renovations proposed by USC include restoring the peristyle to more closely resemble the stadium's original design; replacing every seat in the stadium; increasing the number of aisles, seat width and leg room in many sections ; adding handrails throughout the stadium for safety; constructing a new structure on the south side of the stadium with a new concourse, suites, loge boxes, club seating and remodeled press box; improving audio and visual components; upgrading Wi-Fi and DAS technology for better connectivity; and replacing mechanical, electrical and plumbing systems to meet current standards. Specific modifications to the Original renovation Project primarily include a reduction in the number of luxury suites from 200 suites to 44 suites, reducing the size of the press box from approx. .25,000 sq. ft. to 17,400 sq. ft., reducing concession-related facilities from approx. 35,0000 sq. ft. to 24,500 sq. ft., and reducing ancillary structures from 44,000 sq. ft. (two 20,000-sq. ft. structures and 4,0000 sq. ft. of ancillary structure) to 18,000 sq. ft. The proposed modifications also include the addition of 24 outdoor loge boxes and 1,065 outdoor club seats. With the proposed modifications, the reduction in the maximum seating capacity from 92,500 seats to 78,000 seats previously contemplated under the Original Renovation Project would continue to be implemented.",https://ceqanet.opr.ca.gov/1990011065/7,Los Angeles Memorial Coliseum Renovation Project,Claudia Gutierrez,Los Angeles Memorial Coliseum Commission,N/A,,"500 West Temple St., Room 383",,Los Angeles,CA,90012,2139748118,,Los Angeles,Los Angeles,,"S. Figueroa and Martin Luther King Jr. Boulevard, Vermont",90037,27.4,5037-028-907 (portion),10 and 110,,,,,,,,,,,,,,Los Angeles Memorial Coliseum Commission ,Yes,7/28/2016,Yes,Yes,No,,Yes,,Yes,Yes,"500 West Temple Street, Room 383, Los Angeles, CA 90012"