SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 1987110914,San Bernardino Flood Control District,,,Upper Cactus Basins (3-5) Flood Control System Enhancement Project (Streambed Alteration Agreement No. 1600-2014-0226-R6),NOD,6/1/2015,6/1/2015,"The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2014-0226-R6, pursuant to section 1602 of the Fish and Game Code to the project Applicant, the San Bernardino County Flood Control District. The project is limited to the widening and deepening of the Basins 3/3A, 4 & 5, collectively termed the Upper Cactus Basins, and the Cactus Channel to an average depth of 50 feet, the realignment of the Basins with Cactus Channel to the north and Rialto Channel to the south, the construction of Division of Safety of Dams (DSOD) earthen dams between Basins 3/3A and 4, and between Basins 4 and 5, and various appurtenant structures. The construction of the project will impact a total of 86.4 acres, consisting of temporary impacts to 45.3 acres of alluvial fan sage scrub and 10.6 acres of streambed, as well as permanent impacts to 6.1 acres of Riversidian alluvial fan sage scrub (RAFSS), 15.5 acres of streambed, 7.6 acres of willow cottonwood woodland, 0.1 acre of chaparral, and 1.2 acres of mulefat scrub.",https://ceqanet.opr.ca.gov/1987110914/10,Upper Cactus Basins Enhancement Project,Claire Ingel,CDFW Inland Deserts Region,N/A,,"3602 Inland Empire Blvd, Suite C-220",,Ontario,CA,91764,9094843979,34°8'22"N 117°30'13"W,Rialto,San Bernardino,,"Basline Road, Cactus Avenue",92376,115.9,"0264-151-50, 1264-151-72, 0264-213-50, 0264-213-17, 0264-213-13, 0264-213-46, 0264-213-16",Hwy 210,Rialto Channel/Cactus Channel,Rialto Municipal (closed),,,,,,,,,,,,CDFW ,No,6/1/2015,No,Yes,No,,Yes,,No,Yes,"CDFW Inland Deserts Region, 3602 Inland Empire Blvd, Suite C-220, Ontario, CA 91764"