SCH Number 2020030267
Project Info
- Title
- Subsequent Initial Study and Mitigated Negative Declaration - Cactus Avenue Corridor Groundwater Wells Project
- Description
- The Raw Water Conveyance Pipeline Phase III involves construction and operation of approximately 12,500 linear feet of 18-inch diameter PVC raw water transmission pipeline with air release valves within Ironwood Avenue and Perris Boulevard. The proposed project would convey raw groundwater from Well 66, located on the south side of Ironwood Avenue at approximately the intersection with Kevin Street, to the planned central treatment facility on Perris Boulevard between Bay Avenue and St. Christopher Lane. The proposed project would augment local water supply in the EMWD service area by conveying extracted and treated groundwater, while also cleaning up contamination areas of concern in the Perris North Groundwater Basin.
5 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Eastern Municipal Water District (EMWD) | Cactus Avenue Corridor Groundwater Wells Project Phase 3 Pipelines ISMND | |
NOD | Eastern Municipal Water District (EMWD) | Cactus Avenue Corridor Groundwater Wells Project Phase 3 Pipelines | |
MND | Eastern Municipal Water District (EMWD) | Subsequent Initial Study and Mitigated Negative Declaration - Cactus Avenue Corridor Groundwater Wells Project | |
NOD | Eastern Municipal Water District (EMWD) | Cactus Avenue Corridor Groundwater Wells Project | |
MND | Eastern Municipal Water District (EMWD) | Cactus Avenue Corridor Groundwater Wells Project |