CHEVRON PRODUCTS COMPANY - Issuance of an Alteration Authority to Construct and Permit to Operate, (Air District Application 714498).

Summary

SCH Number
2025020371
Public Agency
Bay Area Air Quality Management District (BAAQMD)
Document Title
CHEVRON PRODUCTS COMPANY - Issuance of an Alteration Authority to Construct and Permit to Operate, (Air District Application 714498).
Document Type
NOE - Notice of Exemption
Received
Posted
2/12/2025
Document Description
Chevron has submitted an Accelerated Permit application under Air District Regulation 2-1-302.2.3 to alter its five power plant boilers (S-4129, 5-4131, S-4132, S-4133, and S-4135) and to alter its Fluidized Catalytic Cracking Unit (FCCU, S-4285) so that they can operate their FCCU without its Power Recovery Turbine (PRT). 5-4285 converts high-boiling point hydrocarbon fractions of crude oil into gasoline and other petroleum products and consists of a reactor vessel and a regenerator vessel. The conversion process is achieved through a chemical process that occurs in the reactor vessel that incorporates the use of heat and a catalyst to break up, or "crack," long-chain hydrocarbons into smaller-chain hydrocarbons. Large paraffinic hydrocarbon molecules break up, or "crack," into smaller molecules that flow overhead from the reactor vessel to a fractionator for separation into saleable products. The spent catalyst that participates in the cracking reaction falls to the bottom of the reactor vessel and is steam stripped as it exits the reactor bottom to remove absorbed hydrocarbons. The spent catalyst from the reactor vessel is then routed to the regenerator vessel where the carbon deposited on the catalyst from the cracking reactions is combusted off with preheated air supplied by the Main Air Blower (MAB). The hot regenerated catalyst from the regenerator vessel then returns to the reactor vessel for another cracking cycle. The flue gas from the regenerator vessel is routed to the 3rd stage separator vessel where cyclones within the 3rd stage separator vessel remove the larger catalyst fines entrained in the flue gas. The larger catalyst fines gravity flow to the fines transfer vessel and are collected in the fines transfer vessel's fines hoppers and are transferred off-site. During typical operation, a portion of the flue gas from the 3rd stage separator vessel is routed to the PRT and expander where the pressure and temperature in the flue gas are reduced to generate shaft horsepower which is used to drive the MAB. The flue gas from MAB, and the remaining portion of flue gas from the 3rd stage separator vessel are routed to the Waste Heat Steam Generator (WHSG) where the flue gas is cooled prior to entering the electrostatic precipitator (ESP). The ESP (A-14) which abates S-4285 removes particulate matter entrained in the flue gas. The flue gas exiting A-14 is routed through an economizer to recover heat from the flue gas and preheats the feed water for the refinery's steam generating equipment before exiting out the stack. The MAB can be powered by the PRT, the steam turbine and/or the motor-generator. The stator vanes and rotor in the PRT were recently damaged and need repairs rendering the PRT inoperable. As discussed above and during typical operation, the PRT provides most of the power to the MAB. When the PRT is not operating, the steam turbine which provides power for start-up and lets down high pressure steam for electrical power recovery, must operate with the motor generator which turns the remaining horsepower from the PRT and steam turbine into electricity to fully power the MAB. Since the FCCU will be unable to operate the PRT, the FCCU will need to utilize steam turbine capacity, thus increasing steam consumption by about 2.88 million pounds per day. The increase in steam consumption at the steam turbine will be made up by two or more of the five power plant boilers which collectively supply steam to the refinery. To ensure Chevron's proposal to operate the FCCU without the PRT is an alteration per 2-1-233, the temporary Permit to Operate (TPO) that was issued on September 19, 2024 which is valid until March 18, 2025 imposed emission limits (daily, annual, and combined) for all criteria air pollutants and fuel usage limits (daily, annual, and combined) for each one of the five power plant boilers from data Chevron provided to the Air District as part of Regulation 12-15 for calendar years 2016-2023 to ensure they operate within the confines of those emission and fuel usage limits and are not modified per Air District Regulation 2-1-234.

Contact Information

Name
Chris Thompson
Agency Name
Bay Area Air Quality Management District (Air District)
Job Title
Air Quality Engineer
Contact Types
Lead/Public Agency

Name
Laurie Mintzer
Agency Name
Chevron Richmond Refinery
Job Title
Senior Permit Specialist
Contact Types
Project Applicant

Location

Cities
Richmond
Counties
Contra Costa
Regions
Citywide
Cross Streets
Western Avenue.
Zip
94801
Other Location Info
841 Chevron Way, Richmond, Contra Costa County, CA 94801.

Notice of Exemption

Exempt Status
Ministerial
Type, Section or Code
Sec. 21080(b)(1); 15268(a)
Reasons for Exemption
The 2024 California Environmental Quality Act (CEQA) Statues and Guidelines lists classes of projects in Section 15300, which have been determined not to have a significant effect on the environment and which shall, therefore be exempt from the provisions of CEQA. This permit application is not subject to CEQA because the Air District's evaluation is a ministerial action (Public Resources Code Section 21080(b)(l) and CEQA Guidelines Section 15268(a)) conducted using the fixed standards and objective measurements in the Air District's rules and regulations.

Exempt Status
Categorical Exemption
Type, Section or Code
§ 15301
Reasons for Exemption
Furthermore, this permit application is categorically exempt from CEQA because CEQA Guidelines, Section 15301 exempts projects that involve negligible or no expansion of use, such as this proposed project. Since all the affected sources of this permit application are being altered due to changes in methods of operation, and no new infrastructure or sources are being constructed, the proposed project involves negligible or no expansion of use. Further, based on the review of the permit application materials, including Appendix H, environmental information form, the project will not have any significant environmental impacts, and cumulative impacts from successive projects of the same type in the same place will not result in significant environmental impacts."
County Clerk
Contra Costa

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.