CPUD Recycle Backwash Project
2 Documents in Project
Summary
SCH Number
2024110310
Lead Agency
Calaveras Public Utility District
Document Title
CPUD Recycle Backwash Project
Document Type
NOD - Notice of Determination
Received
Posted
3/20/2025
Document Description
The project would involve construction of a backwash recycle pump station and force main pipeline from the existing backwash ponds at the existing CPUD Water Treatment Plant to a new diffuser structure in Jeff Davis Reservoir. The pump station would occupy approximately 49.35 square feet. All portions of the project would be located on CPUD property. No additional land needs to be acquired. The project was previously approved by CPUD; the March 18 action established the project CEQA determination.
Contact Information
Name
Tyla Daries
Agency Name
CPUD/WGA Engineering
Job Title
Project Manager
Contact Types
Lead/Public Agency / Project Applicant
Phone
Email
Location
Coordinates
Cities
Railroad Flat, Mokelume Hill
Counties
Calaveras
Regions
Citywide
Cross Streets
W Forty Road/ Res Road
Zip
95245
Total Acres
1
Jobs
1
Parcel #
None
State Highways
26
Railways
None
Airports
None
Schools
None
Waterways
Jeff Davis Reservoir
Township
6N
Range
13E
Section
27/28
Base
MDBM
Other Location Info
1601 W. Forty Road
Notice of Determination
Approving Agency
Calaveras Public Utilities District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Calaveras
Final Environmental Document Available at
https://www.cpud.org/cpud-system-work-and-news
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.