ADDENDUM TO THE SAN JOSÉ DATA CENTER FINAL ENVIRONMENTAL IMPACT REPORT

5 Documents in Project

Summary

SCH Number
2021020002
Lead Agency
California Energy Commission
Document Title
ADDENDUM TO THE SAN JOSÉ DATA CENTER FINAL ENVIRONMENTAL IMPACT REPORT
Document Type
NOD - Notice of Determination
Received
Posted
4/14/2025
Document Description
The 2022 Project consisted of the construction and operation of an approximately 396,914 gross square foot data center facility with a maximum electrical load of 99 MW. Two single-story data center buildings would be constructed, with the northern building (referred to as SJC02) totaling approximately 244,676 gross square feet and the southern building (referred to as SJC03) totaling approximately 152,238 gross square feet. Out of the 396,914 gross square feet for the two data center buildings, approximately 13,826 gross square feet would be administrative space consisting of restrooms and shower facilities, storage areas, and loading docks. A new 115 kilovolt (kV) electrical substation would be located in the northwestern corner of the data center site with two underground 115 kV electrical supply lines that would connect the new 115 kV substation to PG&E Los Esteros Substation, located adjacent to the western boundary of the data center site. The electrical supply lines from the 115 kV substation to the PG&E Los Esteros Substation would be approximately 0.2 miles long.

Contact Information

Name
Tina Garg
Agency Name
City of San Jose PBCE
Job Title
Supervising Planner
Contact Types
Responsible Agency

Name
Peter Witters
Agency Name
Microsoft Corporation
Job Title
Applicant
Contact Types
Project Applicant

Name
Lisa Worrall
Agency Name
California Energy Commission
Job Title
Senior Environmental Planner
Contact Types
Lead/Public Agency

Location

Cities
San Jose
Counties
Santa Clara
Regions
Citywide, Countywide
Cross Streets
Alviso-Milpitas Rd/Ranch Rd/Mc Carthy Blvd

Notice of Determination

Approving Agency
City of San Jose
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.