Streambed Alteration Agreement No. 1600-2020-0242-R2 (GO 4 GOLD Timber Harvesting Plan 4-20-00017-ELD, Sierra Pacific Industries)
Summary
- SCH Number
- 2020120473
- Lead Agency
- Forestry and Fire Protection, Department of (California Department of Forestry and Fire Protection)
- Document Title
- Streambed Alteration Agreement No. 1600-2020-0242-R2 (GO 4 GOLD Timber Harvesting Plan 4-20-00017-ELD, Sierra Pacific Industries)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/23/2020
- Project Applicant
- Sierra Pacific Industries
- Document Description
- The projects are limited to the repair, maintenance, and use of waterhole drafting sites, installation of a vented ford crossing, maintenance and replacement of corrugated metal pipe (CMP) culverts, the removal and abandonment of crossings and CMPs, relocation of instream boulders for bank stabilization, and the installation of a temporary crossing or the installation of a French drain to facilitate crossing a wet seepage area along a permanent road.
- Contact Information
-
Ian Boyd
California Department of Fish and Wildlife, Region 2
1701 Nimbus Road
Rancho Cordova, CA 95670
Phone : (916) 932-3035
ian.boyd@wildlife.ca.gov
Location
- Counties
- El Dorado
- Regions
- Northern California
- Waterways
- Sopiago Creek, O Connor Gulch, Cedar Creek, Oregon Gulch, and their connecting tributaries
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- is available to the general public at the office location listed above for the Lead Agency
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- No
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Attachments
- Notice of Determination
- 1600-2020-0242-R2_NOD_Fresno PDF 229 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.