Cottage Creek Dam Modification Project

3 Documents in Project

Summary

SCH Number
2020080441
Lead Agency
Yuba County Water Agency
Document Title
Cottage Creek Dam Modification Project
Document Type
NOD - Notice of Determination
Received
Posted
4/20/2021
Document Description
The project consists of implementing several modifications to the existing Cottage Creek Dam to prevent potential future public safety issues associated with aging infrastructure. The modifications consist of removing the existing corrugated metal pipe spillway and downstream culvert, excavating a portion of the dam down to a lower elevation and installing a large concrete box culvert sized to pass all Cottage Creek flows downstream past the Cottage Creek Dam and into New Bullards Bar Reservoir. This will result in the drainage of Cottage Creek Reservoir and conversion of the existing open water habitat into wetland and streambed. The portion of the dam embankment not impacted by the new box culvert will remain in place, as will the existing water treatment facilities.

Contact Information

Name
Gabriele Quillman
Agency Name
California Department of Fish and Wildlife
Contact Types
Responsible Agency

Location

Counties
Yuba
Regions
Northern California
Parcel #
064-010-000

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Yuba
Final Environmental Document Available at
to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print