All Power Labs, Inc.

Summary

SCH Number
2019018185
Lead Agency
Energy Commission (California Energy Commission)
Document Title
All Power Labs, Inc.
Document Type
NOE - Notice of Exemption
Received

Document Description
The Recipient will develop a highly usable, bankable, and cost-effective, micro-scale combined cooling, heating and power (CCHP) system integrated with and powered by a biomass gasification waste-to-energy system, the Power Pallet. The Power Pallet CCHP system will be able to integrate its electrical, heating, and cooling outputs with light industrial and commercial building applications, avoiding a substantial amount of natural gas and electricity usage. The objective of the pilot project is to demonstrate a replicable, scalable model for use in the commercial and light industrial sectors, which are highly appropriate for, but underserved by combined heat and power and CCHP technology.

Contact Information
Silvia Palma-Rojas
California Energy Commission
1516 Ninth Street, MS-48
Sacramento, CA 95814

(916) 327-1716

Location

Cities
Ontario Berkeley
Counties
San Bernardino Alameda
Other Location Info
7325 Edison Ave 1010 Murray St

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301
Reasons for Exemption
The Energy Commission made CEQA findings pertaining to this project when the project was originally approved by the Commission on 2/15/17. The Energy Commission found that the project is exempt b/c it involves installation of a micro-scale combined cooling, heating and power system integrated with and powered by a biomass gasification waste-to-energy system in an existing commercial facility. This amendment does not alter the original CEQA determination. 15301. Existing Facilities - This project involves installing a micro-scale combined cooling, heating and power system integrated with and powered by a biomass gasification waste-to-energy system in an existing commercial facility. This will be a minor alteration of the facility, which involves negligible expansion of use beyond that existing currently. CCR, tit 14, S 15329(b) Cogeneration projects at existing facilities. This exemption consists of the installation of cogeneration equipment with a capacity of 50 MW or less at existing facilities meeting the conditions described in this section. The pilot project will integrate two 20 kW biomass gasifiers with a 4 ft by 4 ft footprint, with municipal solid waste pelletizing equipment and with the electrical, heating, and cooling needs of the site's existing commercial facility.

Attachments

Notice of Exemption
2019018185   PDF 69 K