Klamath River Renewal Project - Winter Water Quality Monitoring (Project)

Summary

SCH Number
2018108250
Public Agency
State Water Resources Control Board
Document Title
Klamath River Renewal Project - Winter Water Quality Monitoring (Project)
Document Type
NOE - Notice of Exemption
Received
Posted
10/10/2018
Document Description
The Klamath River Renewal Corporation's (KRRC) Klamath River Renewal Project - Winter Water Quality Monitoring (Project) is to install two 4-inch conduits and one 1-inch conduit on each of the following existing United States Geological Survey (USGS) gage stations: USGS Gage No. 11516530; USGS Gage No., 11520500; USGS No. 11623000; and USGS Gage No. 11530500. The conduit pipes will be secured with either rock bolts to bedrock or boulders using a hand drill or with metal rebar posts driven into substrate using hand tools. The conduit pipes will be placed along the river bottom at a depth of three to eight feet below the low water surface level.

Contact Information

Name
Philip Choy
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Counties
Siskiyou

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15304, 15306, Class 4 & 6
Reasons for Exemption
Minor proposing alterations to land, water, and vegetation which do no tinvolve the removal of healthy, mature, scenic trees. Basic data collection, research, and resource evaluation activities which are not expected to result in serious or major disturbances to environmental resources.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print