MPS Station 27 Beresford Tanks Project

2 Documents in Project

Summary

SCH Number
2015072057
Lead Agency
State Water Resources Control Board
Document Title
MPS Station 27 Beresford Tanks Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
F1B - One Family Dwelling "B"
Document Description
The California Water Service Company is proposing to increase storage capacity for the water system by installing a 3.86-million gallon tank along with a 1-MG tank, designated Phase 1 and Phase 2, respectively. The Project would double storage capacity at existing Mid-Peninsula District (MPS) Station 27 from 5 MG to approximately 10 MG. Phase 1 includes the installation of the new 3.86-MG concrete storage tank (161 ft. in diameter and 35 ft. in height), and also associated piping and accessories for connecting to the existing distribution system. Phase 2 will include installation of the 1-MG tank (80 ft. in diameter and 32 ft. in height) and associated piping and accessories to connect to the existing distribution system.

Contact Information

Name
Gabriel Edwards
Agency Name
State Water Resources Control Board, Div. of Drinking Water
Contact Types
Lead/Public Agency

Location

Cities
San Mateo
Counties
San Mateo
Cross Streets
In the vicinity of Highway 92 and Highway 82
Zip
94403
State Highways
Hwy 82, 92, 101, 280
Railways
Caltrain Hayward Park
Schools
College of San Mateo

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 4 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Water Facilities (Type Storage Tank, MGD 3.86mg)
Project Issues
Air Quality, Biological Resources, Transportation, GHGE

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print