Freeway Performance Initiative 1-680 in Alameda County (04-4G111)
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2013112047
- Lead Agency
- California Department of Transportation, District 4
- Document Title
- Freeway Performance Initiative 1-680 in Alameda County (04-4G111)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/23/2016
- Present Land Use
- State Highway
- Document Description
- This project proposes the installation of a ramp metering system for sixteen on-ramps/connectors along Route 680 in Alameda County from Scott Creek Road Undercrossing in the City of Fremont to Alcosta Boulevard Overcrossing in the City of Dublin. These on-ramps/connectors are also widened to provide for High Occupancy Vehicle (HOV) preferential lanes or additional mixed-flow lanes. There will be six retaining walls used for the widening. The project also proposes the installation of traffic monitoring stations for four connectors in the corridor.
- Contact Information
-
Noray-Ann Sprading
California Department of Transportation, District 4
Lead/Public Agency
111 Grand Avenue, MS 8B
Oakland, CA 94612
Phone : (510) 286-5961
Location
- Cities
- Dublin Fremont Pleasanton
- Counties
- Alameda
- Other Location Info
- Sunol
Notice of Determination
- Approving Agency
- Caltrans #4
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 111 Grand Ave., MS 8-B, Oakland, CA 94612
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.